Stretch Ceiling PVC Keel / PVC Profile

FOB Reference Price:Get Latest Price
US $0.45-0.57 / Square Meter | 1000 Square Meter/Square Meters (Min. Order)
Supply Ability:
100000 Square Meter/Square Meters per Month
Port:
Guangzhou
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
Langyu
Model Number:
2.5m
Material:
PVC
Function:
Decorative
Surface Treatment:
Stained
material:
PVC
Length:
2.5m
Working temperature:
-20-60degrees
Fire-resistant Grade:
B-1 Level
Packaging & Delivery
Packaging Details
In cartons
Delivery Time
10 workdays after receiving the deposit

Specifications

Stretch Ceiling PVC Keel / PVC Profile
1.PVC Profile
2.PVC Profile for stretch ceiling
3.PVC Keel for stretch ceiling

 

1.  What's is Stretch Ceilings ?

Stretch Ceiling Systems are decorative membranes that can be used in nearly any application. The membranes are most common for creating ceiling applications, but may also be used to create wall applications, ceiling and wall murals, suspended 3-D panels, or freestanding features. They can be given virtually any shape. The membrane is made with a special polyvinyl chloride base that is guaranteed to be cadmium-free. 

 

2. Specification:

 

 

Style

Gossy film, matt film, Satin film, Translucent film, printing Film(Translucent and lack),Brushed Suede Film, Marble Film,. perforated Film, metallic Film, Glitter Film. Mirror film

Technic Date

  • Chemical composition: 74%PVC   ,26% plasticizer
  • Width: 1.5m-5m
  • Weight: 240-320 g/m2
  • Thickness: 0.18 mm±10 percent
  • Afford Weight: 195kg/square meter
  • Translucent rate: 75%(translucent film), 25-30%(lacquer film), 35-40%(matte film), 10-25%(suede film)
  • Maximum tensile strength: up to 17 MPa
  • Ultimate tensile strength: 30 N (both lengthwise and edgewise)
  • Maximum ambient temperature: -25 ° to +40 °
  • Light absorption coefficient: 30 percent (film canvaseswith mirror effect)  to 95 percent (webbed canvases)
  • Shore hardness number: 41±2
  • Weighted mean acoustical reduction factor: -0.4
  • Stands pressure up to 1000 Pa
  • Thermal conduction: 0.16 and more
  • Broken Tensile : 262%

Surface

Lackfolie, matte,satin and others

Special Performance

anti-cold, water repellent, UV ,Flame retardant ,antibacterial, fireproof

 
Packaging & Shipping

  

Package

foil rolled face to face

Packed in  hard tube,PE film and kraft paper,wooden cartons and so on as customer preference

 

 

 

3. Advantages

 

 

 

 

 

Stretch Celling

Tile Celling

Suspended Celling

Plasterboard Celling

Lath Celling

Moisture Resistant

 

Yes

 

No

 

No

 

No

 

Yes

Time of Installation(20)

 

2 hrs

 

4+ hrs

 

15 hrs

 

20hrs+painting

 

5 hrs

Colour Choise

 

180+

Need to paint

 

5

 

Need to paint

 

5

Minimum Loss of Room Height

 

2.5cm

 

1.5 cm

 

10 cm

 

5 cm

 

5 cm

Need to Renew wall

 

No

Painting every2-3 yrs

 

3-4years

Painting every2-3 yrs

 

3-4years

Warranty period

10 years

3 yrs

2 yrs

15 yrs

3-4 yrs

Possibility of Multilevel Ceiling

 

Yes

 

No

 

No

 

Yes

 

No

 

 

 

 

 

Company Information

 

  

4. CERTIFICATE:   

 

 

 

 

 

5.Required tools and accessories

 .

 

 

 

 

                                                                                                              PVC Profile

 

               

 

Machines

 

 

6.Installation

 

Two steps : stretching and affixing the membrane to the installed frame (track).

 

Installation starts In order to start installation the spatula is inserted into the harpoon which has been attached to the edges of the membrane, and hooking the assembly on to the track. After the corner is hooked up, the same procedure is repeated with the diagonally opposite corner, and so on until all corners are firmly attached. It is important to maintain balanced stretching of the membrane, in order to prevent the membrane from skewing at this early stage of installation.

 

 

 


Next, the points in between those already hooked into the tracks are hooked in too, spacing the work evenly until the entire membrane has been attached to the entire track.

 

 

 

During the entire process, installers keep one eye on the entire membrane so as to ensure that the installation is balanced and wrinkle free. Membrane that stretches around pipes needs to be reinforced. We accomplish this by using a translucent panel, usually acrylic. Light fixtures, air fans, or other objects that hang from the ceiling must have independent hanging mechanisms attached to the ceiling structure, so that they do not rely on the stretched ceiling for support. Stretch ceiling is an interior design element, and not a structural component. Normally, the entire installation process takes about two hours to be completed, and leaves no waste behind, providing that Laqfoil bespoke (to made to specification) tracks and membrane are used .

 

 
Our Services

  

           

 

 

7.WorkShop 

 

 

 

 

 

 

8.How to place order ?

 

 

 

 9. Payment and Shipping Terms

 

 

Echo

Call me or send message by: +86-18676890251

Skype: echo.area 

 QQ:2214845509